Wind farms
Chemin d’Avesnes (France)| Chemin d’Avesnes (France) |
|
| Operational (39,6 MW) |

| Country | France |
| County/Zone | 59 (Hauts-de-France) |
| City | Avesnes-le-Sec - Iwuy |
| Wind farm type | Onshore wind farm |

![]() | 18 MW commissioned |
![]() | 21.6 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() ![]() |
| Owners |
![]() ![]() |
| Manufacturer |
|

| Operational | Vestas V117/3300 (x 11) |

![]() | |
![]() | |

| Part | Avesnes - Iwuy |
| City | Avesnes-le-Sec, Iwuy |
| Commissioning | ![]() |
| Turbines | 5x Vestas V117/3300 (power 3,300 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 18,000 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 13' 59.5" - Longitude 3° 22' 4.8" |
| Precise localization | Yes |
| Part | Avesnes le Sec |
| City | Avesnes-le-Sec, Iwuy |
| Commissioning | ![]() |
| Turbines | 6x Vestas V117/3300 (power 3,300 kW, diameter 117 m) |
| Hub height | ![]() |
| Total nominal power | 21,600 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 50° 13' 59.5" - Longitude 3° 22' 4.8" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Avesnes 2 (1 km) Les Saules (4 km) Saint Vaast (7 km) Carnières (7 km) La Chaussée Brunehaut (59) (8 km) Chemin de Grès (8 km) Saint-Python (8 km) Chemin de Valenciennes (8 km) Bévillers (8 km) Les Dunes (9 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 59 (Hauts-de-France) : 547.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 December 2025 |
||