Wind farms
Coquelicot 1 (France)| Coquelicot 1 (France) |
|
| Operational (32,3 MW) |

| Country | France |
| County/Zone | 80 (Hauts-de-France) |
| City | Acheux-en-Amiénois - Authie - Bus-lès-Artois - Louvencourt - Vauchelles-lès-Authie |
| Wind farm type | Onshore wind farm |

![]() | 9.2 MW commissioned |
![]() | 4.6 MW commissioned |
![]() | 9.2 MW commissioned |
![]() | 2.3 MW commissioned |
![]() | 4.7 MW commissioned |
![]() | 2.3 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E82/2300 (x 11) |
| Operational | Enercon E82/2350 (x 2) |
| Operational | Enercon E70/2300 (x 1) |

![]() | |

| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbines | 4x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 9,200 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbines | 4x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 9,200 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbine | 1x Enercon E70/2300 (power 2,300 kW, diameter 71 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
| Part | Julie |
| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbines | 2x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
| Part | Julie |
| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbines | 2x Enercon E82/2350 (power 2,350 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
| Part | Julie |
| City | Authie, Vauchelles-lès-Authie, Louvencourt, Bus-lès-Artois, Acheux-en-Amiénois |
| Commissioning | ![]() |
| Turbine | 1x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 50° 5' 46.2" - Longitude 2° 31' 16.3" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Clémentine (3 km) Les Trois Communes (62) (7 km) Les Trois Communes (80) (7 km) Sources de l’Ancre (15 km) Coquelicot 2 (15 km) Magremont (15 km) La Tourette (80) (17 km) Croix Noire 1 (17 km) Ablainzevelle (17 km) Rond-Buisson (17 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 80 (Hauts-de-France) : 2,334.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 23 January 2026 |
||