Wind farms
Big Level (USA)| Big Level (USA) |
|
| Operational (90 MW) |

| Country | USA |
| County/Zone | Pennsylvania |
| City | Hector Township |
| Wind farm type | Onshore wind farm |

![]() | 21.6 MW commissioned |
![]() | 68.4 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 3.6-137 (x 25) |

![]() | |

| City | Hector Township |
| Commissioning | ![]() |
| Turbines | 6x GE Vernova 3.6-137 (power 3,600 kW, diameter 137 m) |
| Hub height | ![]() |
| Total nominal power | 21,600 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 53' 20.4" - Longitude -77° 41' 19" |
| Precise localization | Yes |
| City | Hector Township |
| Commissioning | ![]() |
| Turbines | 19x GE Vernova 3.6-137 (power 3,600 kW, diameter 137 m) |
| Hub height | ![]() |
| Total nominal power | 68,400 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 53' 20.4" - Longitude -77° 41' 19" |
| Precise localization | Yes |
Databases ![]() USA (255.3 GW) Americas (617.8 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Eight Point (21 km) Canisteo wind farm (28 km) Marsh Hill (36 km) Sunny Alfred (42 km) Howard II (48 km) Howard (48 km) Armenia Mountain (64 km) Baron Winds (66 km) Laurel Hill (67 km) Cohocton Wind Farm (72 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Pennsylvania : 1,766.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 19 December 2025 |
||