Wind farms
High Lonesome (TX) (USA)| High Lonesome (TX) (USA) |
|
| Operational (481,235 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Crockett - Upton |
| Wind farm type | Onshore wind farm |

![]() | 135.135 MW commissioned |
![]() | 147 MW commissioned |
![]() | 50.6 MW commissioned |
![]() | 107.1 MW commissioned |
![]() | 41.4 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturers |
|

| Operational | Nordex AW-3000/132 (x 49) |
| Operational | GE Vernova 2.3-116 (x 40) |
| Operational | Nordex AW-3465/132 (x 39) |
| Operational | Nordex AW-3150/125 (x 34) |

![]() | |

| City | Upton, Crockett |
| Commissioning | ![]() |
| Turbines | 39x Nordex AW-3465/132 (power 3,465 kW, diameter 132 m) |
| Hub height | ![]() |
| Total nominal power | 135,135 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 31° 9' 22" - Longitude -101° 53' 26.6" |
| Precise localization | Yes |
| City | Upton, Crockett |
| Commissioning | ![]() |
| Turbines | 49x Nordex AW-3000/132 (power 3,000 kW, diameter 132 m) |
| Hub height | ![]() |
| Total nominal power | 147,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 31° 9' 22" - Longitude -101° 53' 26.6" |
| Precise localization | Yes |
| City | Upton, Crockett |
| Commissioning | ![]() |
| Turbines | 22x GE Vernova 2.3-116 (power 2,300 kW, diameter 116 m) |
| Hub height | ![]() |
| Total nominal power | 50,600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 31° 9' 22" - Longitude -101° 53' 26.6" |
| Precise localization | Yes |
| City | Upton, Crockett |
| Commissioning | ![]() |
| Turbines | 34x Nordex AW-3150/125 (power 3,150 kW, diameter 125 m) |
| Hub height | ![]() |
| Total nominal power | 107,100 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 31° 9' 22" - Longitude -101° 53' 26.6" |
| Precise localization | Yes |
| Part | Expansion |
| City | Upton, Crockett |
| Commissioning | ![]() |
| Turbines | 18x GE Vernova 2.3-116 (power 2,300 kW, diameter 116 m) |
| Hub height | ![]() |
| Total nominal power | 41,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 31° 9' 22" - Longitude -101° 53' 26.6" |
| Precise localization | Yes |
Databases ![]() USA (255.3 GW) Americas (617.4 GW) World (2,464.1 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Appaloosa Run (6 km) Ranchero (13 km) Big Sampson Wind (16 km) Southwest Mesa Wind Farm (24 km) Desert Sky Wind Farm Repowering (32 km) Indian Mesa Wind Farm (35 km) King Mountain Wind Ranch (35 km) Desert Sky Wind Farm (35 km) Shamrock Wind (38 km) Shamrock Wind Facility (White Mesa Wind III) (38 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 51,338.2 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 3 July 2026 |
||