Wind farms
Kosten (Argentina)| Kosten (Argentina) |
|
| Operational (24 MW) |

| Country | Argentina |
| County/Zone | Chubut |
| City | Pampa del Castillo |
| Wind farm type | Onshore wind farm |

![]() | 3.6 MW commissioned |
![]() | 20.4 MW commissioned |

| Developers |
![]() ![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Senvion 3.4M114 (x 6) |
| Operational | Senvion 3.6M114 NES (x 1) |

![]() | |
![]() | |

| City | Pampa del Castillo |
| Commissioning | ![]() |
| Turbine | 1x Senvion 3.6M114 NES (power 3,600 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 3,600 kW |
| Status | Operational |
| Developers | /![]() |
| Owner | ![]() |
| Coordinates | Latitude -45° 48' 32.9" - Longitude -68° 3' 26.5" |
| Precise localization | Yes |
| City | Pampa del Castillo |
| Commissioning | ![]() |
| Turbines | 6x Senvion 3.4M114 (power 3,400 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 20,400 kW |
| Status | Operational |
| Developers | /![]() |
| Owner | ![]() |
| Coordinates | Latitude -45° 48' 32.9" - Longitude -68° 3' 26.5" |
| Precise localization | Yes |
Databases ![]() Argentina (5.2 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tordillo (12 km) Manantiales (AR) (26 km) Diadema (30 km) Antonio Moran (35 km) Rada Tilly (39 km) Cañadon Leon (93 km) Los Hércules (95 km) | ||
|
Insights Production capacity Argentina : 4,497.0 MW (end of 2025) Chubut : 1,288.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 7 July 2024 |
||