[Back to previous page]
Generalities
|
|
Details
- City: Trans-sur-Erdre
- Commissioning:

- 3 turbines: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
- Hub height:

- Total nominal power: 12,600 kW
- Operational
- Onshore wind farm
- Developer: Windstrom
Localisation
Update for this sheet: 20 November 2025
Complete/correct this sheet: