Wind farms
Strauss (USA)| Strauss (USA) |
|
| Operational (95,25 MW) |

| Country | USA |
| County/Zone | California |
| City | Santa Barbara |
| Wind farm type | Onshore wind farm |

![]() | 88.09 MW commissioned |
![]() | 7.16 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 3.8-137 (x 23) |
| Operational | GE Vernova 1.7-100 (x 4) |

![]() | |

| City | Santa Barbara |
| Commissioning | ![]() |
| Turbines | 23x GE Vernova 3.8-137 (power 3,800 kW, diameter 137 m) |
| Hub height | ![]() |
| Total nominal power | 88,090 kW (uprated turbines) |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 34° 34' 45.2" - Longitude -120° 31' 21.8" |
| Precise localization | Yes |
| City | Santa Barbara |
| Commissioning | ![]() |
| Turbines | 4x GE Vernova 1.7-100 (power 1,700 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 7,160 kW (uprated turbines) |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 34° 34' 45.2" - Longitude -120° 31' 21.8" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms CADEMO Demonstration (16 km) Aikido Demonstration (138 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) California : 7,466.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 December 2025 |
||