[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Stargard Szczecinski
- Commissioning:

- 15 turbines: Siemens SWT-2.3-93 (power 2 300 kW, diameter 93 m)
- Hub height:

- Total nominal power: 34,500 kW
- Operational
- Onshore wind farm
- Developer: EPA Sp zoo
- Operator: RWE
- Owner:

- Source:

Production forecast
- From Tuesday, June 6 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.5 %
- Expected production: 20,540 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 20 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Hub height:

- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Developer: RWE
- Operator: RP Global
- Owner:

- Source:

Production forecast
- From Tuesday, June 6 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.8 %
- Expected production: 33,340 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 3' 33.2"
- Longitude: 15° 41' 36.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 54° 21' 38.7"
- Longitude: 16° 47' 47.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 21 September 2022
Complete/correct this sheet: