Horse Hollow I (USA)| Horse Hollow I (USA) |
|
| Operational (213 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Taylor |
| Wind farm type | Onshore wind farm |

![]() | 210 MW commissioned |
![]() | 3 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5sle (x 142) |

![]() | |

| City | Taylor |
| Commissioning | ![]() |
| Turbines | 2x GE Vernova 1.5sle (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 32° 12' 2.2" - Longitude -100° 1' 34.9" |
| Precise localization | Yes |
| City | Taylor |
| Commissioning | ![]() |
| Turbines | 140x GE Vernova 1.5sle (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 210,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 32° 12' 2.2" - Longitude -100° 1' 34.9" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Horse Hollow III (0 km) Horse Hollow II (8 km) Callahan Divide Wind Energy Center (12 km) Buffalo Gap 3 (15 km) Buffalo Gap 1 (17 km) Buffalo Gap 2 (17 km) Turkey Track (23 km) South Trent Mesa (29 km) Trent Mesa Wind Farm (30 km) Sweetwater 1 (36 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 50,699.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 30 December 2025 |
||