[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Baileux IV
- City: Baileux
- Commissioning:

- 1 turbine: Enercon E103/2350 (power 2 350 kW, diameter 103 m)
- Total nominal power: 2,350 kW
- Operational
- Onshore wind farm
- Developer: BEE
- Owners:
/
- Source:

Part #2:
- Part: Chimay
- City: Baileux
- Commissioning:

- 4 turbines: GE Energy 2.5xl (power 2 500 kW, diameter 100 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: Greenwind
- Operator: Ventient Energy
- Owner:

- Source:

Production forecast
- From Monday, September 25 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.3 %
- Expected production: 17,560 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Chimay II
- City: Baileux
- Commissioning:

- 2 turbines: GE Energy
- Hub height:

- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

Production forecast
- From Monday, September 25 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 20.4 %
- Expected production: 24,430 kWh
- Values from Weathernews Windcaster solution
Part #4:
- Part: Chimay II
- City: Baileux
- Commissioning:

- 3 turbines: GE Energy
- Hub height:

- Total nominal power: 8,250 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

Localisation
Part #1:
- Part: Baileux IV
- Latitude: 50° 2' 48.1"
- Longitude: 4° 21' 18.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Chimay
- Latitude: 50° 2' 38.3"
- Longitude: 4° 22' 46.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Chimay II
- Latitude: 50° 2' 48.1"
- Longitude: 4° 21' 18.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Chimay II
- Latitude: 50° 2' 48.1"
- Longitude: 4° 21' 18.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 20 October 2022
Complete/correct this sheet: