Wind farms
Whispering Willow North (USA)| Whispering Willow North (USA) |
|
| Operational (201,26 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Franklin |
| Wind farm type | Onshore wind farm |

![]() | 171.36 MW commissioned |
![]() | 29.9 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | GE Vernova 2.5-127 (x 68) |
| Operational | GE Vernova 2.3-116 (x 13) |

| No source available |

| City | Franklin |
| Commissioning | ![]() |
| Turbines | 68x GE Vernova 2.5-127 (power 2,500 kW, diameter 127 m) |
| Hub height | ![]() |
| Total nominal power | 171,360 kW (uprated turbines) |
| Status | Operational |
| Coordinates | Latitude 42° 44' 50.4" - Longitude -93° 27' 40.8" |
| Precise localization | Yes |
| City | Franklin |
| Commissioning | ![]() |
| Turbines | 13x GE Vernova 2.3-116 (power 2,300 kW, diameter 116 m) |
| Hub height | ![]() |
| Total nominal power | 29,900 kW |
| Status | Operational |
| Coordinates | Latitude 42° 44' 50.4" - Longitude -93° 27' 40.8" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Franklin County Wind (21 km) Century III (25 km) Whispering Willow (27 km) Hancock County Wind Farm (28 km) Century I (28 km) Leonardo Wind 1 (29 km) Century II (32 km) Cerro Gordo (34 km) Cerro Gordo Repower (34 km) Mason City (43 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Iowa : 15,858.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 December 2025 |
||