Wind farms
Timber Road IV (USA)| Timber Road IV (USA) |
|
| Operational (126 MW) |

| Country | USA |
| County/Zone | Ohio |
| City | Paulding |
| Wind farm type | Onshore wind farm |

![]() | 100.8 MW commissioned |
![]() | 25.2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() |
| Manufacturer |
|

| Operational | Vestas V150/4000-4200 (x 24) |
| Operational | Vestas V136/3450 (x 7) |

| No source available |

| City | Paulding |
| Commissioning | ![]() |
| Turbines | 24x Vestas V150/4000-4200 (power 4,000 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 100,800 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 41° 6' 31" - Longitude -84° 42' 18.8" |
| Precise localization | Yes |
| City | Paulding |
| Commissioning | ![]() |
| Turbines | 7x Vestas V136/3450 (power 3,450 kW, diameter 136 m) |
| Hub height | ![]() |
| Total nominal power | 25,200 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 41° 6' 31" - Longitude -84° 42' 18.8" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Timber Road I (7 km) Holcim - Paulding Wind (12 km) Timber Road II (12 km) Northwest Ohio (13 km) Haviland (14 km) Blue Creek (19 km) Cooper Farms (25 km) TJ Automation (51 km) Archbold Area Schools (56 km) Ottawa Whirlpool (58 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Ohio : 1,113.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 December 2025 |
||