Wind farms
Thunderhead (USA)| Thunderhead (USA) |
|
| Operational (299,36 MW) |

| Country | USA |
| County/Zone | Nebraska |
| City | Antelope - Wheeler |
| Wind farm type | Onshore wind farm |

![]() | 23 MW commissioned |
![]() | 276.36 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | GE Vernova 2.8-127 (x 98) |
| Operational | GE Vernova 2.3-116 (x 10) |

![]() | |
![]() | |

| City | Antelope, Wheeler |
| Commissioning | ![]() |
| Turbines | 10x GE Vernova 2.3-116 (power 2,300 kW, diameter 116 m) |
| Hub height | ![]() |
| Total nominal power | 23,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 42° 2' 47.1" - Longitude -98° 14' 32.5" |
| Precise localization | Yes |
| City | Antelope, Wheeler |
| Commissioning | ![]() |
| Turbines | 98x GE Vernova 2.8-127 (power 2,800 kW, diameter 127 m) |
| Hub height | ![]() |
| Total nominal power | 276,360 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 42° 2' 47.1" - Longitude -98° 14' 32.5" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Prairie Breeze I (18 km) Prairie Breeze III (24 km) Upstream (25 km) Laredo Ridge (25 km) Petersburg (NE) (28 km) Prairie Breeze II (30 km) Grande Prairie (68 km) Sholes (77 km) Creston Ridge (81 km) Elkhorn Ridge (82 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Nebraska : 3,511.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 December 2025 |
||