[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Brugge
- Commissioning:

- 2 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,100 kW
- Operational
- Onshore wind farm
- Developer: Electrabel
- Operator: Engie
- Owner:

- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 57 %
- Expected production: 56,090 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Zeebrugge
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Owner:

Part #3:
- City: Zeebrugge
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Owner:

Part #4:
- City: Zeebrugge
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Owner:

Part #5:
- City: Zeebrugge
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Owner:

Localisation
Part #1:
- Latitude: 51° 18' 58"
- Longitude: 3° 11' 9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 19' 39.7"
- Longitude: 3° 12' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 19' 39.7"
- Longitude: 3° 12' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 51° 19' 39.7"
- Longitude: 3° 12' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 19' 39.7"
- Longitude: 3° 12' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: