Wind farms
Headwaters II (USA)| Headwaters II (USA) |
|
| Operational (198 MW) |

| Country | USA |
| County/Zone | Indiana |
| City | Randolph |
| Wind farm type | Onshore wind farm |

![]() | 151.2 MW commissioned |
![]() | 46.8 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V150/4000-4200 (x 36) |
| Operational | Vestas V136/3450 (x 13) |

| No source available |

| City | Randolph |
| Commissioning | ![]() |
| Turbines | 36x Vestas V150/4000-4200 (power 4,000 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 151,200 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 4' 34.4" - Longitude -85° 10' 34.5" |
| Precise localization | Yes |
| City | Randolph |
| Commissioning | ![]() |
| Turbines | 13x Vestas V136/3450 (power 3,450 kW, diameter 136 m) |
| Hub height | ![]() |
| Total nominal power | 46,800 kW (uprated turbines) |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 4' 34.4" - Longitude -85° 10' 34.5" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Headwaters (14 km) Winchester (21 km) Shenandoah High School (31 km) Bitter Ridge (32 km) Union City (33 km) Randolph Eastern School (34 km) Bluff Point (34 km) Greenville Whirlpool (48 km) Wildcat (Indiana) (63 km) Cooper Farms (106 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Indiana : 3,725.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 December 2025 |
||