![]() | 23 MW commissioned |
![]() | 126.9 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Siemens-Gamesa SG 2.7-129 (x 47) |
| Operational | Siemens-Gamesa (x 10) |

![]() | |

| City | Adams |
| Commissioning | ![]() |
| Turbines | 10x Siemens-Gamesa |
| Hub height | ![]() |
| Total nominal power | 23,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 46° 53' 0.5" - Longitude -118° 26' 3.6" |
| Precise localization | Yes |
| City | Adams |
| Commissioning | ![]() |
| Turbines | 47x Siemens-Gamesa SG 2.7-129 (power 2,700 kW, diameter 129 m) |
| Hub height | ![]() |
| Total nominal power | 126,900 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 46° 53' 0.5" - Longitude -118° 26' 3.6" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tucannon River Wind Project (60 km) Lower Snake River I (63 km) Hopkins Ridge I (69 km) Hopkins Ridge II (69 km) Marengo I (74 km) Marengo II (74 km) Stateline (WA) (102 km) Nine Canyon I (102 km) Nine Canyon II (102 km) Nine Canyon III (102 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Washington : 3,695.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 9 June 2026 |
||