Part #1:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 6,000 kW
  • Dismantled (2015/05)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #2:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 4,000 kW
  • Dismantled (2015/11)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #3:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V164/8000 (power 8 000 kW, diameter 164 m)
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Vestas
  • Operator: Vestas
  • Owner:
  • Source: Reserved for Premium Access

Part #4:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens SWT-7.0-154 (power 7 000 kW, diameter 154 m)
  • Hub height:
  • Total nominal power: 7,000 kW
  • Dismantled (2017/02)
  • Onshore wind farm
  • Developer: Siemens
  • Source: Reserved for Premium Access

Part #5:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 7,000 kW
  • Operational
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #6:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens SWT-8.0-154 (power 8 000 kW, diameter 154 m)
  • Hub height:
  • Total nominal power: 8,000 kW
  • Dismantled (2018/08)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #7:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 8,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Siemens
  • Source: Reserved for Premium Access

Part #8:


Part #9:


Part #10:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V155/3300 (power 3 300 kW, diameter 155 m)
  • Total nominal power: 3,300 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V236/15.0 MW (power 15 000 kW, diameter 236 m)
  • Total nominal power: 15,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Vestas
  • Operator: Vestas
  • Owner:

Part #12:

Localisation


Part #1:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #11:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #12:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 0
Complete/correct this sheet:



The Wind Power
All rights reserved - 2005-2024 - Cookie Policy
Conditions of Use and Sale - Partners
The Wind Power LinkedIn page  The Wind Power Twitter page