[Back to previous page]
Details
- City: Kalpitiya
- Commissioning:

- 5 turbines: Gamesa G97/2000 (power 2 000 kW, diameter 97 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: Senok Group
- Operator: Senok Group
- Owner:

- Source:

Localisation
- Latitude: 8° 13' 44.6"
- Longitude: 79° 45' 14.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 May 2022
Complete/correct this sheet: