Högaliden (Sweden)| Högaliden (Sweden) |
|
| Operational (105 MW) |

| Country | Sweden |
| County/Zone | Västerbotten |
| City | Umea |
| Wind farm type | Onshore wind farm |

![]() | 105 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V150/4000-4200 (x 25) |

![]() | |

| Hub height | ![]() |
| Total nominal power | 105,000 kW (uprated turbines) |
| Coordinates | Latitude 64° 17' 50.7" - Longitude 20° 17' 20.4" |
| Altitude | 315 m |
| Precise localization | No |
Databases ![]() Sweden (92.9 GW) Europe (660.0 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Blisterliden (14 km) Fäbodliden II (18 km) Blabergsliden (37 km) Granberget (37 km) Sävar (49 km) Burea (58 km) Tomasliden (59 km) Holmsund (69 km) Hörnefors (75 km) Fjällboheden (79 km) | ||
|
Insights Production capacity Sweden : 18,515.0 MW (end of 2025) Västerbotten : 1,948.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 8 September 2025 |
||