The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access Wind farms Osterild (Denmark)


Sign up    Log in    Search

[Back to previous page]

Denmark wind farms file


Generalities

Details


Part #1:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 6,000 kW
  • Dismantled (2015/05)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #2:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 4,000 kW
  • Dismantled (2015/11)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #3:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V164/8000 (power 8 000 kW, diameter 164 m)
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Vestas
  • Operator: Vestas
  • Owner:
  • Source: Reserved for Premium Access

Part #4:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens SWT-7.0-154 (power 7 000 kW, diameter 154 m)
  • Hub height:
  • Total nominal power: 7,000 kW
  • Dismantled (2017/02)
  • Onshore wind farm
  • Developer: Siemens
  • Source: Reserved for Premium Access

Part #5:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 7,000 kW
  • Operational
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #6:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens SWT-8.0-154 (power 8 000 kW, diameter 154 m)
  • Hub height:
  • Total nominal power: 8,000 kW
  • Dismantled (2018/08)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #7:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 8,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Siemens
  • Source: Reserved for Premium Access

Part #8:


Part #9:


Part #10:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V155/3300 (power 3 300 kW, diameter 155 m)
  • Total nominal power: 3,300 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Osterild
  • Commissioning:
  • 1 turbine: Vestas V236/15.0 MW (power 15 000 kW, diameter 236 m)
  • Total nominal power: 15,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Vestas
  • Operator: Vestas
  • Owner:

Part #12:

Localisation


Part #1:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #11:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #12:

  • Latitude: 57° 3' 23.8"
  • Longitude: 8° 52' 56.6"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 23 May 2023
Complete/correct this sheet:



The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page