[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Meineweh
- Commissioning:

- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source:

Production forecast
- From Thursday, March 30 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 57.3 %
- Expected production: 20,620 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Meineweh
- Commissioning:

- 1 turbine: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developers: WPD/Sowitec
- Operator: WPD
- Owner:

- Source:

- Source:

Production forecast
- From Thursday, March 30 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 92.6 %
- Expected production: 16,680 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 3' 16.2"
- Longitude: 12° 0' 4.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 4' 33"
- Longitude: 11° 59' 4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 November 2022
Complete/correct this sheet: