[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Meineweh
- Commissioning: 2004
- 1 turbine: Neg Micon NM72c/1500 (power 1 500 kW, diameter 72 m)
- Hub height: 64 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Source: http://www.wpd.de/referenzen/
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 86.9 %
- Expected production: 31,280 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Meineweh
- Commissioning: 2004
- 1 turbine: Neg Micon
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner: WPD
- Source: http://www.wpd.de/referenzen/
Production forecast
- From Monday, December 09 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 91 %
- Expected production: 16,380 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 3' 16.2"
- Longitude: 12° 0' 4.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 4' 33"
- Longitude: 11° 59' 4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 November 2019
Complete/correct this sheet: