			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Chaganaobao Gacha
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Adjoining Baiyunebo
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Operator: State Power Investment Group
 
Part #3: 
- City: Bailingmiao
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 100,000 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Barun
 - 83 turbines: Goldwind GWH171-5.3 (power 5 300 kW, diameter 171 m)
 - Total nominal power: 439,900 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Damao Banner
 - 10 turbines: Goldwind GWH171-6.0 (power 6 000 kW, diameter 171 m)
 - Total nominal power: 60,000 kW
 - Operational
 - Onshore wind farm
 
Part #6: 
- City: Baotou
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 120,000 kW
 - Operational
 - Onshore wind farm
 
Part #7: 
- Part: Part 1
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 20,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Jinjie New Energy Co
 
Part #8: 
- Part: Part 1
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Damao Banner Tianrun Windpower Co
 
Part #9: 
- Part: Part 2
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 20,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Jinjie New Energy Co
 
Part #10: 
- Part: Part 2
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Damao Banner Tianrun Windpower Co
 
Part #11: 
- Part: Part 3
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Operator: Damao Banner Tianrun Windpower Co
 
Localisation
Part #1: 
- Latitude: 43° 14' 38.3"
 - Longitude: 114° 19' 30"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 43° 14' 38.3"
 - Longitude: 114° 19' 30"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 41° 31' 1.2"
 - Longitude: 110° 35' 59.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
- Latitude: 41° 46' 8.3"
 - Longitude: 109° 53' 6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 40° 38' 9.6"
 - Longitude: 109° 50' 52.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 41° 52' 58.8"
 - Longitude: 109° 52' 59.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Part: Part 1
 - Latitude: 41° 23' 31.2"
 - Longitude: 110° 59' 20.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Part: Part 1
 - Latitude: 41° 46' 12"
 - Longitude: 109° 43' 48"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Part: Part 2
 - Latitude: 43° 14' 38.3"
 - Longitude: 114° 19' 30"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #10: 
- Part: Part 2
 - Latitude: 41° 45' 46.7"
 - Longitude: 109° 35' 56.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #11: 
- Part: Part 3
 - Latitude: 41° 44' 5.9"
 - Longitude: 109° 33' 10.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  