[Back to previous page]
	
		| Generalities |   | 
Details
Part #1: 
Part #2: 
- City: Hongnijingcun
- Commissioning:  
- Turbine(s): (manufacturer name not available)  
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
Part #3: 
- City: Hongnijingcun
- Commissioning:  
- Turbine(s): (manufacturer name not available)  
- Total nominal power: 48,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1: 
- Latitude: 41° 27' 0"
- Longitude: 109° 42' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2: 
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #3: 
- Latitude: 41° 23' 5.9"
- Longitude: 109° 48' 53.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020
Complete/correct this sheet: