Wind farms
Bassenge (Belgium)| Bassenge (Belgium) |
|
| Operational (17,85 MW) |

| Country | Belgium |
| County/Zone | Liège (Wallonie) |
| City | Bassenge |
| Wind farm type | Onshore wind farm |

![]() | 17.85 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Siemens-Gamesa SG 2.6-114 (x 9) |

![]() | |

| Hub height | ![]() |
| Total nominal power | 17,850 kW (downrated turbines) |
| Coordinates | Latitude 50° 46' 39.3" - Longitude 5° 37' 21.5" |
| Precise localization | No |
Databases ![]() Belgium (9.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Wonck (1 km) Tongeren-Oost (8 km) Juprelle-Bassenge (8 km) Riemst-Membruggen (8 km) Hauts-Sarts (9 km) Tongeren-Vreren (9 km) Celanese (12 km) Bilzen-Kieleberg (16 km) Bilzen (17 km) Bilzen E313 (17 km) | ||
|
Insights Production capacity Belgium : 5,860.0 MW (end of 2025) Liège (Wallonie) : 366.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 10 October 2024 |
||