[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Saint-Bon
- Commissioning:

- 3 turbines: Vestas V117/4000-4200 (power 4 000 kW, diameter 117 m)
- Hub height:

- Total nominal power: 12,600 kW (uprated turbines)
- Operational
- Onshore wind farm
Part #2:
- City: Saint-Bon
- 3 turbines: (manufacturer name not available)
- Total nominal power: 12,600 kW (uprated turbines)
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Latitude: 48° 41' 13.9"
- Longitude: 3° 28' 52.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
Update for this sheet: 4 June 2026