Wind farms
El Puntal I (Spain)| El Puntal I (Spain) |
|
| Operational (26 MW) |

| Country | Spain |
| County/Zone | Málaga (Andalucía) |
| City | Sierra de Yeguas |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 20 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G87/2000 (x 10) |
| Operational | Gamesa G90/2000 (x 3) |

![]() | |

| City | Sierra de Yeguas |
| Commissioning | ![]() |
| Turbines | 3x Gamesa G90/2000 (power 2,000 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 37° 10' 11.4" - Longitude -4° 50' 47.2" |
| Precise localization | Yes |
| City | Sierra de Yeguas |
| Commissioning | ![]() |
| Turbines | 10x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Hub height | ![]() |
| Total nominal power | 20,000 kW |
| Status | Operational |
| Developers | /![]() |
| Coordinates | Latitude 37° 10' 11.4" - Longitude -4° 50' 47.2" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Puntal II (3 km) Cerro Gavira (8 km) Martin de la Jara (10 km) Las Angosturas (13 km) Los Barrancos (14 km) La Cuesta (14 km) El Alamo (14 km) Cortijo La Linera (14 km) Menaute (15 km) Los Arcos (17 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Málaga (Andalucía) : 634.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||