Frameries (Belgium)| Frameries (Belgium) |
|
| Operational (8,4 MW) |

| Country | Belgium |
| County/Zone | Hainaut (Wallonie) |
| City | Frameries |
| Wind farm type | Onshore wind farm |

![]() | 8.4 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V117/4000-4200 (x 2) |

![]() | |

| Total nominal power | 8,400 kW (uprated turbines) |
| Coordinates | Latitude 50° 24' 37.6" - Longitude 3° 55' 36.8" |
| Precise localization | Yes |
Databases ![]() Belgium (9.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Mons-Quévy (4 km) Quévy (4 km) Ghlin (8 km) Estinnes (10 km) Dour-Quiévrain (13 km) Le Roeulx (14 km) Strépy-Bracquegnies (17 km) Houdeng-Goegnies (20 km) La Louvière Garocentre (20 km) Lobbes et Merbes-le-Château (21 km) | ||
|
Insights Production capacity Belgium : 5,860.0 MW (end of 2025) Hainaut (Wallonie) : 649.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 10 April 2026 |
||