[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Almatret
- Commissioning:

- 22 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 44,000 kW
- Operational
- Onshore wind farm
- Developer: Element Power
- Owners:
/
Production forecast
- From Saturday, February 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 12.2 %
- Expected production: 128,890 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Almatret
- Commissioning:

- 3 turbines: Vestas V90/1800 (power 1 800 kW, diameter 90 m)
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developer: Element Power
- Owner:

Production forecast
- From Saturday, February 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 12.8 %
- Expected production: 16,640 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 18' 18.3"
- Longitude: 0° 24' 8.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 18' 18.3"
- Longitude: 0° 24' 8.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 August 2022
Complete/correct this sheet: