Generalities
|
|
Details
Part #1:
- City: Greci
- Commissioning:

- 13 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 11,050 kW
- Operational
- Onshore wind farm
- Operator: IVPC
- Source:

Production forecast
- From Monday, April 3 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 92 %
- Expected production: 244,040 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Greci
- Commissioning:

- 22 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 14,520 kW
- Operational
- Onshore wind farm
- Operator: ERG SpA
- Owner:

- Source:

Production forecast
- From Monday, April 3 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 95.1 %
- Expected production: 331,540 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Greci
- Commissioning:

- 3 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 1,980 kW
- Operational
- Onshore wind farm
- Operator: ERG SpA
- Owner:

- Source:

Production forecast
- From Monday, April 3 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 95.1 %
- Expected production: 45,210 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 41° 16' 34.3"
- Longitude: 15° 11' 24.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 16' 22.2"
- Longitude: 15° 10' 23.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 41° 16' 22.2"
- Longitude: 15° 10' 23.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: