Wind farms
Derramador (Spain)| Derramador (Spain) |
|
| Operational (50 MW) |

| Country | Spain |
| County/Zone | Albacete (Castilla-La Mancha) |
| City | Chinchilla de Montearagon |
| Wind farm type | Onshore wind farm |

![]() | 50 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Siemens-Gamesa SG 5.0-145 (x 10) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 38° 48' 57.8" - Longitude -1° 22' 17.7" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Frontones (3 km) Virgen de Belén I Ampliación (6 km) Virgen de Belén I (8 km) La Herrada (8 km) Eras de Bonete (9 km) La Cuerda (9 km) Los Pedreros (13 km) Muela (13 km) Virgen de Belén II (13 km) Reventones (15 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Albacete (Castilla-La Mancha) : 2,433.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 August 2024 |
||