[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Amarante
- Commissioning:

- 20 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.7 %
- Expected production: 13,780 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Amarante
- Commissioning:

- 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Enernova
- Operator: EDP Renovaveis
- Owner:

- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.5 %
- Expected production: 6,500 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Amarante
- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Source:

Localisation
Part #1:
- Latitude: 41° 15' 0"
- Longitude: -7° 53' 23.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 41° 15' 0"
- Longitude: -7° 53' 23.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 41° 15' 0"
- Longitude: -7° 53' 23.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 June 2022
Complete/correct this sheet: