[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Rio Maior
- Commissioning:

- 11 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 33,000 kW
- Operational
- Onshore wind farm
- Developer: Enersis
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.8 %
- Expected production: 22,110 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Rio Maior
- Commissioning:

- 26 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 78,000 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 2.8 %
- Expected production: 52,270 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Rio Maior
- Commissioning:

- 5 turbines: Senvion MM100 (power 2 000 kW, diameter 100 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Operator: Ventient Energy
- Owner:

- Source:

Production forecast
- From Sunday, September 24 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.8 %
- Expected production: 11,510 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 39° 23' 23.8"
- Longitude: -8° 56' 44.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 39° 23' 23.8"
- Longitude: -8° 56' 44.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 39° 23' 23.8"
- Longitude: -8° 56' 44.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 December 2022
Complete/correct this sheet: