- City: Febvin-Palfart
- Commissioning:

- 5 turbines: Vestas V112/3450 (power 3 450 kW, diameter 112 m)
- Total nominal power: 18,000 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: Boralex
- Operator: Boralex