			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
- City: Hyde
 - Commissioning: 

 - 71 turbines: GE Energy 2.8-127 (power 2 800 kW, diameter 127 m)
 - Hub height: 

 - Total nominal power: 200,220 kW (uprated turbines)
 - Operational
 - Onshore wind farm
 - Developer: Engie
 