Wind farms
Montgomery Ranch (USA)| Montgomery Ranch (USA) |
|
| Operational (201,9 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Foard |
| Wind farm type | Onshore wind farm |

![]() | 8.4 MW commissioned |
![]() | 193.5 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Vestas V150/4.5MW (x 43) |
| Operational | Vestas V150/4000-4200 (x 2) |

| No source available |

| City | Foard |
| Commissioning | ![]() |
| Turbines | 2x Vestas V150/4000-4200 (power 4,000 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 8,400 kW (uprated turbines) |
| Status | Operational |
| Coordinates | Latitude 33° 50' 40.2" - Longitude -99° 39' 46.6" |
| Precise localization | Yes |
| City | Foard |
| Commissioning | ![]() |
| Turbines | 43x Vestas V150/4.5MW (power 4,500 kW, diameter 150 m) |
| Hub height | ![]() |
| Total nominal power | 193,500 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 33° 50' 40.2" - Longitude -99° 39' 46.6" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Foard City (9 km) Escalade Wind (12 km) El Campo (US) (14 km) Green Pastures II (22 km) Griffin Trail (27 km) Green Pastures I (32 km) Blue Summit III (40 km) Blue Summit II (46 km) Lockett (48 km) Seymour Hills (51 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 50,699.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 December 2025 |
||