[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #2:
- Part: Part 11
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #3:
- Part: Part 13
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 36,000 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #4:
- Part: Part 14
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 27,000 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #5:
- Part: Part 17
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #6:
- Part: Part 20
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #7:
- Part: Part 21
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #8:
- Part: Part 23
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 36,000 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #9:
- Part: Part 24
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 27,000 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #10:
- Part: Part 8
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 22,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Part #11:
- Part: Part 9
- City: Gentio do Ouro
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 40,500 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Owner:

Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
- Part: Part 17
- Latitude: -11° 27' 57.5"
- Longitude: -42° 33' 32.3"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Part: Part 20
- Latitude: -11° 31' 44.3"
- Longitude: -42° 37' 26.4"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
Part #8:
Part #9:
- Part: Part 24
- Latitude: -11° 36' 14.3"
- Longitude: -42° 33' 21.5"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
Part #11:
- Part: Part 9
- Latitude: -11° 30' 25.1"
- Longitude: -42° 35' 56.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 28 April 2025
Complete/correct this sheet: