Wind farms
Urad Rear Banner Distributed (China)| Urad Rear Banner Distributed (China) |
|
| Operational (100 MW) |

| Country | China |
| County/Zone | Inner Mongolia |
| City | Zhusimu’er |
| Wind farm type | Onshore wind farm |

![]() | 50 MW commissioned |
![]() | 50 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer | #ND |

| Operational | #ND |

| No source available |

| City | Zhusimu’er |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 41° 18' 25.2" - Longitude 106° 51' 53.9" |
| Precise localization | No |
| City | #ND |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 41° 17' 59.9" - Longitude 106° 54' 0" |
| Precise localization | No |
Databases ![]() China (720.8 GW) Asia (1,068.0 GW) World (2,499.8 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Wulatehou Banner Saiwusu (17 km) Wulatehou Banner Wuliji (17 km) Urad Rear Banner (Mengneng) (22 km) Saiwusu I (29 km) Saiwusu II (30 km) Saiwusu III (30 km) Wulatehou Banner Chaoge (30 km) Wulatehou Banner Hailisu (35 km) Wulatehou Banner 1 (38 km) Wulate Rear Banner (40 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Inner Mongolia : 121,298.1 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 1 October 2026 |
||