Wind farms
Albrechtsfeld (Austria)| Albrechtsfeld (Austria) |
|
| Operational (34,7 MW) |

| Country | Austria |
| County/Zone | Burgenland |
| City | Albrechtsfeld |
| Wind farm type | Onshore wind farm |

![]() | 30 MW commissioned |
![]() | 4.7 MW commissioned |

| Developer |
![]() |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E101/3000 (x 10) |
| Operational | Enercon E103/2350 (x 2) |

![]() | |
![]() | |
![]() | |

| City | Albrechtsfeld |
| Commissioning | ![]() |
| Turbines | 10x Enercon E101/3000 (power 3,000 kW, diameter 101 m) |
| Hub height | ![]() |
| Total nominal power | 30,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 47° 49' 56.1" - Longitude 17° 1' 25.2" |
| Precise localization | Yes |
| Part | Erweiterung |
| City | Albrechtsfeld |
| Turbines | 2x Enercon E103/2350 (power 2,350 kW, diameter 103 m) |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 47° 49' 56.1" - Longitude 17° 1' 25.2" |
| Precise localization | No |
Databases ![]() Austria (4.4 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Halbturn Heide (2 km) Halbturn Neuriss (2 km) Halbturn Puszta (2 km) Halbturn (3 km) Andau (6 km) Halbturn Nord (7 km) Mönchhof Erweiterung (8 km) Nickelsdorf (AT) (8 km) Edmundshof (8 km) Mönchhof Ost (8 km) | ||
|
Insights Production capacity Austria : 4,221.0 MW (end of 2025) Burgenland : 1,682.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 May 2026 |
||