[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 108 turbines: Goldwind GWH171-6.0 (power 6 000 kW, diameter 171 m)
- Total nominal power: 648,000 kW
- Operational
- Onshore wind farm
- Source:

Localisation
- Latitude: -6° 30' 35.8"
- Longitude: -36° 21' 25.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 17 September 2025
Complete/correct this sheet: