[Back to previous page]
Details
- City: Nowogard
- Commissioning:

- 1 turbine: Vestas V29/225 (power 225 kW, diameter 29 m)
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
- Developer: EPA Sp zoo
- Operator: EPA Sp zoo
- Owner:

- Source:

Production forecast
- From Tuesday, May 24 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 33.4 %
- Expected production: 1,800 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 53° 40' 36.9"
- Longitude: 15° 7' 48.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 24 April 2019
Complete/correct this sheet: