[Back to previous page]
Details
- Commissioning:

- 2 turbines: Nowomag
- Total nominal power: 320 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, May 30 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1 %
- Expected production: 80 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 51° 5' 50.7"
- Longitude: 16° 5' 54.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: