[Back to previous page]
Generalities
- Wind farm name: Shepherds Flat Wind Farm
- Country: USA
- County / Zone: Oregon
|
|
Details
Part #1:
- City: Gilliam, Morrow
- Commissioning:

- 78 turbines: GE Energy 2.5-100 (power 2 500 kW, diameter 100 m)
- Hub height:

- Total nominal power: 195,000 kW
- Dismantled (2021)
- Onshore wind farm
- Developers: Caithness/Blattner Energy
- Source:

Part #2:
- City: Gilliam, Morrow
- Commissioning:

- 4 turbines: GE Energy 2.5-100 (power 2 500 kW, diameter 100 m)
- Hub height:

- Total nominal power: 1,000 kW (downrated turbines)
- Dismantled (2021)
- Onshore wind farm
- Developers: Caithness/Blattner Energy
- Source:

Part #3:
- Part: Repowering
- City: Gilliam, Morrow
- Commissioning:

- 4 turbines: GE Energy 2.5-100 (power 2 500 kW, diameter 100 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Operator: Caithness
- Owner:

Part #4:
- Part: Repowering
- City: Gilliam, Morrow
- Commissioning:

- 78 turbines: GE Energy
- Hub height:

- Total nominal power: 217,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Update for this sheet: 17 January 2026
Complete/correct this sheet: