[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- City: As Somozas
- Commissioning:

- 80 turbines: Ecotecnia 44 (power 600 kW, diameter 44 m)
- Total nominal power: 48,000 kW
- Dismantled (2025)
- Onshore wind farm
Part #2:
- Part: Part 2
- City: As Somozas
- 7 turbines: Vestas V150/6.0MW (power 6 000 kW, diameter 150 m)
- Total nominal power: 42,000 kW
- Under construction
- Onshore wind farm
- Developer: Naturgy
Part #3:
- Part: Part 2
- City: As Somozas
- 2 turbines: Vestas V110/2200 (power 2 200 kW, diameter 110 m)
- Total nominal power: 4,400 kW
- Under construction
- Onshore wind farm
- Developer: Naturgy
- Source:

Localisation
Part #1:
Part #2:
Part #3:
Update for this sheet: 6 April 2026