Wind farms
Les Trois Muids (France)| Les Trois Muids (France) |
|
| Operational (11 MW) - Dismantled (11,5 MW) |

| Country | France |
| County/Zone | 28 (Centre-Val de Loire) |
| City | Terminiers |
| Wind farm type | Onshore wind farm |

![]() | 11.5 MW commissioned |
![]() | 11.5 MW decommissioned |
![]() | 11 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Vestas V110/2200 (x 5) |
| Dismantled | Nordex N90/2300 (x 5) |

![]() | |
![]() | |

| City | Terminiers |
| Commissioning | ![]() |
| Turbines | 5x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 11,500 kW |
| Status | Dismantled (2026) |
| Developer | ![]() |
| Coordinates | Latitude 48° 4' 45.6" - Longitude 1° 42' 11.6" |
| Altitude | 124/133 m |
| Precise localization | Yes |
| City | Terminiers |
| Commissioning | ![]() |
| Turbines | 5x Vestas V110/2200 (power 2,200 kW, diameter 110 m) |
| Hub height | ![]() |
| Total nominal power | 11,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 48° 4' 45.6" - Longitude 1° 42' 11.6" |
| Altitude | 124/133 m |
| Precise localization | Yes |
Databases ![]() France (36.2 GW) Europe (666.7 GW) World (2,490.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Vallée des Gommiers (2 km) Le Carreau (4 km) Cormainville (7 km) Bois Elie (7 km) Le Sainbois (9 km) Bois Louis (11 km) Bornes de Cerqueux (13 km) Champ-Besnard (15 km) Janville (45) (16 km) Janville (28) (16 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 28 (Centre-Val de Loire) : 870.8 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 2 September 2026 |
||