Generalities
|
|
Details
Part #1:
- Commissioning:

- 12 turbines: Envision EN-182/7.0 (power 7 000 kW, diameter 182 m)
- Total nominal power: 84,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning:

- 121 turbines: Envision EN-182/7.5 (power 7 500 kW, diameter 182 m)
- Total nominal power: 907,500 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 42° 17' 33.3"
- Longitude: 111° 16' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 42° 17' 33.3"
- Longitude: 111° 16' 0"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 May 2026