Wind farms
Les Pénages (France)| Les Pénages (France) |
|
| Operational (11 MW) - Dismantled (21,5 MW) |

| Country | France |
| County/Zone | 41 (Centre-Val de Loire) |
| City | Moisy - Ouzouer-le-Doyen |
| Other name | PELEIA II |
| Wind farm type | Onshore wind farm |

![]() | 11.5 MW commissioned |
![]() | 10 MW commissioned |
![]() | 11.5 MW decommissioned |
![]() | 10 MW decommissioned |
![]() | 11 MW commissioned |

| Developers |
![]() ![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V100/2200 (x 5) |
| Dismantled | Nordex N90/2300 (x 5) |
| Dismantled | Vestas V100/2000 (x 5) |

![]() | |

| Part | PELEIA II |
| City | Moisy, Ouzouer-le-Doyen |
| Commissioning | ![]() |
| Turbines | 5x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 11,500 kW |
| Status | Dismantled (2023) |
| Developers | /![]() |
| Coordinates | Latitude 47° 54' 58.6" - Longitude 1° 21' 3.2" |
| Precise localization | Yes |
| Part | PELEIA II |
| City | Moisy, Ouzouer-le-Doyen |
| Commissioning | ![]() |
| Turbines | 5x Vestas V100/2000 (power 2,000 kW, diameter 100 m) |
| Total nominal power | 10,000 kW |
| Status | Dismantled (2023) |
| Developer | ![]() |
| Coordinates | Latitude 47° 54' 58.6" - Longitude 1° 21' 3.2" |
| Precise localization | Yes |
| Part | PELEIA II |
| City | Moisy, Ouzouer-le-Doyen |
| Commissioning | ![]() |
| Turbines | 5x Vestas V100/2200 (power 2,200 kW, diameter 100 m) |
| Total nominal power | 11,000 kW |
| Status | Operational |
| Coordinates | Latitude 47° 54' 58.6" - Longitude 1° 21' 3.2" |
| Precise localization | Yes |
Databases ![]() France (36.1 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Les Mardeaux (2 km) Viertiville (7 km) Bois d’Anchat (12 km) Beauce Oratorienne (15 km) Bornes de Cerqueux (20 km) Bois Louis (21 km) Le Sainbois (23 km) Vallée des Gommiers (30 km) Cormainville (31 km) Les Trois Muids (32 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 41 (Centre-Val de Loire) : 73.5 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 22 June 2026 |
||