Wind farms
Cedar Springs IV (USA)| Cedar Springs IV (USA) |
|
| Operational (392,5 MW) |

| Country | USA |
| County/Zone | Wyoming |
| City | Converse |
| Wind farm type | Onshore wind farm |

![]() | 347.7 MW commissioned |
![]() | 44.8 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 6.1-158 (x 57) |
| Operational | GE Vernova 2.8-127 (x 16) |

| No source available |

| City | Converse |
| Commissioning | ![]() |
| Turbines | 57x GE Vernova 6.1-158 (power 6,100 kW, diameter 158 m) |
| Total nominal power | 347,700 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 43° 6' 24.1" - Longitude -105° 41' 46.9" |
| Precise localization | Yes |
| City | Converse |
| Commissioning | ![]() |
| Turbines | 16x GE Vernova 2.8-127 (power 2,800 kW, diameter 127 m) |
| Total nominal power | 44,800 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 43° 6' 24.1" - Longitude -105° 41' 46.9" |
| Precise localization | Yes |
Databases ![]() USA (255.3 GW) Americas (617.8 GW) World (2,459.0 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Glenrock II (12 km) Glenrock I (13 km) Glenrock III (13 km) Cedar Springs III (14 km) Cedar Springs I (15 km) Top of the World - GE Energy (17 km) Top of the World - Siemens (20 km) Campbell Hill (26 km) Cedar Springs II (36 km) Pioneer (46 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Wyoming : 8,254.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 29 June 2026 |
||