[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Da Mao Qi
 - Commissioning: 

 - 40 turbines: Suzlon S64/1250 (power 1 250 kW, diameter 64 m)
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Hongteng energy
 
Part #2: 
- City: Da Mao Qi
 - Commissioning: 

 - Turbine(s): (manufacturer name not available)  
 - Total nominal power: 50,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Hongteng energy
 
Localisation
Part #1: 
- Latitude: 41° 49' 47.9"
 - Longitude: 110° 27' 0"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 41° 49' 47.9"
 - Longitude: 110° 27' 0"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  
Complete/correct this sheet: