[Back to previous page]
Generalities
|
|
Details
- City: Laholm
- Commissioning:

- 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, January 18 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 13.4 %
- Expected production: 2,120 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 56° 30' 0"
- Longitude: 12° 56' 23.9"
- Altitude: 10 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 December 2020
Complete/correct this sheet: