Generalities
|
|
Details
- City: Laholm
- Commissioning:

- 1 turbine: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, January 22 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 81.5 %
- Expected production: 11,730 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 56° 30' 35.9"
- Longitude: 13° 3' 0"
- Altitude: 25 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 December 2020